GROUT / LINE PUMPS
Down hole grouting

We can set a packer at the top of a 80 to 100 foot 3 inch hole.  Pump grout to fill small
and large voids in lime stone and unstable soils.
Grouted bore under roads 400 plus feet.
Grouted and fill abandon water lines.
Grouted and raise city street and side walks.
Grout fill abandoned storm sewer.
Pressure grouted abandon fuel tanks and lines
We can pressure grout to raise foundations.

We have drilled 18" of freezer floor, working in 18 degree temperature and raised 900
square feet of floor 8"

We have raised underground utility boxes to put them back together.